Earlier this week, Côte d’Ivoire Terminal took delivery of six fleet gantries for the second container terminal currently under construction at the Port of Abidjan. The delivery is part of an overall order of 13 fleet gantries.
This 30-metre-high handling equipment will be used for the loading, unloading and storage of containers in the container yard. The new gantries supplied by ZPMC are equipped with the latest technologies. These include a state-of-the-art control system, and a new-generation power supply system that significantly reduces CO2 emissions and energy consumption.
The aforementioned delivery is a major step in the construction of the terminal, which aims to improve logistics services in Côte d'Ivoire and the countries of the sub-region.
Source: bollore-transport-logistics.com